Free Estimate
The tub comes out. A curbless tiled shower with a bench and grab bars goes in.






We measure the bathroom, check the floor structure, and confirm where the drain can go.
One number for the whole conversion, tile and fixtures included.
The tub comes out. The floor is recessed for the curbless pan and the drain and valve are moved.
Waterproofing, tile, bench, glass, grab bars, and fixtures. Most conversions take one to two weeks.
Most take one to two weeks from demo to finished tile. Moving the drain or fixing a subfloor adds a few days.
Yes. The floor is recessed between the joists or built up around the shower so the pan sits flush. We check the framing on the walkthrough.
No. Grab bars now come in the same finishes as faucets, and set into a tiled wall they read as a towel bar.
Most buyers in the Portland market prefer a walk-in shower in the main bath. Keeping a tub in a second bathroom covers the rest.
We use textured tile rated for wet floors. A curbless shower with a bench is the safest bathroom setup there is.
We walk the house with you and write down what would help.