Accessory Dwelling Units

ADU Builder in Gresham and East Portland

A little house on your property. For a parent, for retirement, or for rent.

Gresham's ADU Specialist

What is an ADU

An accessory dwelling unit is a second, smaller home on the same lot as your house. Most people know it as a mother-in-law unit, a granny flat, or a backyard cottage. It has its own front door, its own kitchen, and its own bathroom, and it is a legal home with its own address. Families build them so a parent can live a few steps away instead of across town, so a retiree can trade a house that got too big for a small one near the grandkids, or so a spare corner of the lot can earn rent. Portland has had builders who specialize in these for years. Gresham has not, and that is the work GenTerra was started to do.

Three Kinds of ADU

The three kinds of ADU

The yard, the garage, and the setbacks usually decide. We tell you on the site visit.

Most private

Detached

A separate small house in the backyard on its own foundation. The choice for most families building for a parent. Up to 750 square feet in Gresham.

A door away

Attached

An addition on the side or back of the house with its own entrance, and a connecting door if you want one. Up to 900 square feet.

Lowest cost

Garage or Basement Conversion

The shell already exists, so you pay for the inside. A basement needs ceiling height and an exit window to be legal. Up to 900 square feet.

The Rules In Gresham

ADU rules in Gresham

Oregon requires every city to allow an ADU with a single-family house. Gresham allows a detached unit up to 750 square feet or half the size of the main house, and an attached unit or conversion up to 900. The city cannot require an added parking space, and you do not have to live in the main house, which is what lets a parent own the unit on a child's lot or a homeowner rent both.

Setbacks, height, and lot coverage depend on your zone. We check them for your address before design starts.

Permits

The part most people underestimate

Zoning and permits are the number one complaint people raise about building an ADU. Plan review takes weeks to months, the city sends comments back, and the drawings get revised. Our owner worked on the city side of permitting before starting GenTerra. He prepares the permit set, answers the reviewer, lines up the engineer, and meets the inspector. You approve the plan and pick the finishes.

What To Expect

Before you decide, know these

The bathroom and kitchen cost the most

Two rooms hold nearly all the plumbing, tile, and cabinets. A second bathroom moves the price more than a hundred extra square feet.

Utilities are the surprise

Water and sewer have to reach the unit from the street or the house. A long trench on a sloped lot can cost as much as a bathroom. We check the run on the site visit.

Check the lot before you design

The most common mistake is drawing a plan, then finding the setbacks shrink it. We start with the zoning and the utilities, then draw.

A parent's unit needs a flush entry

A step at the door and a tub in the bath are the two things families pay to change later. We build the unit for the years ahead from the start.

You will lose some yard or the garage

A detached unit takes part of the backyard. A conversion takes the garage. Worth knowing before you fall in love with a plan.

It takes most of a year

Design and permits take a few months and construction several more. You get a schedule after the site visit.

Who Builds One

Three reasons families call

For a parent

A home of their own a few steps from yours. Their own kitchen, their own front door, and the grandchildren across the lawn.

Built for the years ahead

For retirement

The house got too big and the kids are across town. Sell it, build a small home in a son's or daughter's backyard, and be around family.

Downsizing

For rent

A second dwelling on the lot with its own address, permitted for long-term rent. Many owners build for a parent now and rent later.

Rental questions
"Four hundred square feet is plenty for an older person. Build a little house on the property, be around your kids, and it stays in the family."Joel Kastel, GenTerra Construction
For A Parent

Built for the years ahead

When the unit is for a parent, it is an aging-in-place home from the first drawing. One level. A flush entry with a covered landing. Doorways a walker passes. A curbless shower with a bench and grab bars. A kitchen with a lower counter and pull-out shelves. Bright, even light, and a night light to the bathroom.

Those details cost little in the plan and a great deal after.

Our Work

Backyard ADU, Portland

A detached one-bedroom unit with a covered deck and a yellow front door. Wood floors, windows on two sides, a mini-split, and a full tiled bathroom. Photographed from the empty lawn to move-in.

See the full project

How It Works

How an ADU project works

1

Site visit

We check the lot, the setbacks, the size the city allows, and where the utilities run. You leave knowing what fits.

2

Design

An architect draws a plan sized for how the unit will be used. You approve it before anything is filed.

3

Permits

We prepare the permit set, answer the city, and line up engineering.

4

Build

One crew, one schedule, inspections at each stage, and a finished home with its own address.

Reviews

Reviews from Gresham and Portland homeowners

"My mother moved into the backyard unit in October. She has her own kitchen and her own front door, and the grandkids are across the lawn."

Placeholder review. Replace with a real one.

"They handled the permit and the city from start to finish. We picked the finishes and showed up for inspections."

Placeholder review. Replace with a real one.

"The garage is now a one-bedroom apartment with its own entrance. Rented the first week it was listed."

Placeholder review. Replace with a real one.
Common Questions

ADU questions for Gresham and Portland

How much does it cost to build an ADU in Gresham or Portland?

It depends on the type, the size, the finishes, and how much site and utility work your lot needs. A site visit gives you a working range for your property, and you get a written price after design. Our cost guide explains what moves the number.

What is the cheapest kind of ADU?

A garage or basement conversion, when the structure is sound and dry. The shell exists, so you pay for the inside, the plumbing, and the utilities.

How big can an ADU be in Gresham?

Detached: up to 750 square feet or half the size of the main house. Attached or converted: up to 900 square feet.

How long does it take?

Design and permitting take a few months and construction several more. Most projects take the better part of a year.

Do I need to add a parking space?

No. Oregon law prohibits cities from requiring extra off-street parking for an ADU.

Do I have to live on the property?

No. Oregon removed owner-occupancy requirements, so a parent can own the unit on a child's lot, or a homeowner can rent both dwellings.

Can I rent it out?

Yes. An ADU is a legal dwelling and can be rented long term. Short-term rental rules differ by city.

What are the downsides?

You give up part of the yard or the garage, the build is disruptive for several months, and a rental means being a landlord. For most of the families we build for, a parent close by or a unit that pays for itself outweighs all three.

Get Started

Find out what fits on your lot

A site visit tells you what you can build, how big it can be, and where it can go.